मुख्य सामग्री पर जाएँ

New Delhi: प्रॉपर्टी की कीमतें, प्रोजेक्ट और घर

New Delhi has 293 projects listed on ADiHomes. Asking prices range from ₹4,800 to ₹30,250 per sq ft, with a median of ₹16,190 (based on 123 properties, Oct 2026).

एक नज़र में

प्रोजेक्ट
293
बिक्री के लिए
0
किराए पर
0
प्रति sq ft कीमत (मध्यिका)
₹16,190 from 123 properties
2 BHK किराया (मध्यिका)
अभी पर्याप्त लिस्टिंग नहीं हैं
रहने के लिए तैयार प्रोजेक्ट
292
निर्माणाधीन प्रोजेक्ट
1

ADiHomes की सक्रिय लिस्टिंग से गणना की गई, 18 Oct 2026। मांगी गई कीमतें हैं, पंजीकृत बिक्री की कीमतें नहीं।

Projects in New Delhi

See all

Loading map…

यहाँ प्रोजेक्ट वाले बिल्डर

New Delhi locality guide

Overview

This guide covers New Delhi as a whole city, not one neighbourhood. Buying conditions change a lot between a flat in Mayur Vihar and one in Rohini or Dwarka, so use it as a checklist and then read the area guides. On ADiHomes as of October 2026, there are 0 live projects in New Delhi. Listing pages exist for societies such as Sahyog Apartments, The Ekta Apartment, Akash Ganga Apartment, CGHS Aashiana Apartments, Manu Apartment, Parwana Apartments, Puja Apartment and Vigyapan Lok Apartments. We show no prices here because we have no live listings to quote.

यह कहाँ है और इसकी बसावट कैसी है

We organise Delhi into area guides: Central, East, North, South, West and Dwarka. The example societies above sit in Mayur Vihar Phase 1 (East Delhi) and Rohini Sectors 13 and 24 (North Delhi). Ask for the exact sector or pocket, because rules and services vary from one to the next.

One planning point matters everywhere. The newer Master Plan for Delhi 2041 was still not notified as of April 2026, according to one property-data site. The older MPD-2021, notified in 2007, remains the operative law. Any 2041 zone map a broker shows you is a draft and cannot be relied on.

कनेक्टिविटी

सड़कें

Urban Extension Road-II (UER-II) runs about 75.7 km along Delhi's western side, from Alipur on NH-44 to the Shiv Murti point near IGI Airport. It was reported fully operational on 17 August 2025. The 10.1 km Delhi section of the Dwarka Expressway was also opened around then. It links to UER-II and is meant to ease traffic on the Ring Roads. Dwarka sub-city still has congestion, and a Union minister raised this in a January 2026 review.

मेट्रो

Delhi Metro's Phase 4 is still opening in stages, and reported dates differ between sources.

  • Magenta Line: the Deepali Chowk–Majlis Park section opened on 8 March 2026. One source lists Krishna Park Extension–Deepali Chowk as expected in late 2026 and Majlis Park–RK Ashram Marg in late 2027. DMRC's managing director has said Janakpuri West–RK Ashram Marg should open before the end of 2026.
  • Golden Line: it is meant to link south Delhi with the airport. Partial operations are expected by the end of 2026.
  • Pink Line: DMRC has said the Majlis Park–Maujpur extension is due before the end of 2026. Another source says a Mukundpur–Maujpur section opened in March 2026, so the status is unclear. Check DMRC's site.

Nearest-station distances differ for every address. We have not verified them for this guide, so measure the walking route to the entrance of the exact society you are considering.

हवाई अड्डे

Indira Gandhi International Airport is the main airport. The Noida International Airport at Jewar began commercial flights on 15 June 2026. A travel site puts it about 70 km from central Delhi, so it is mainly relevant for East Delhi and Noida-side travel.

स्कूल, अस्पताल और खरीदारी

We could not verify named schools, hospitals or malls with distances for this update, so we do not list any. Check these on a map for your specific address:

  • The actual road distance at school-run and office hours, not the straight-line distance.
  • Whether a hospital has emergency and ICU services, not just OPD.
  • Whether daily shopping is a short walk away.

खरीदार नागरिक सुविधाओं से जुड़ी ये बातें जांचें

पानी

Delhi's supply is under pressure. A CAG audit tabled in the Delhi Assembly on 23 March 2026 reported rising shortfalls in raw and potable water, and it also flagged leakage and poor quality. One analysis says the city draws more groundwater than is naturally replenished. The government's Summer Action Plan 2026 included hired tankers for shortage areas. Ask residents about supply hours, pressure and water quality, and check whether the building depends on a borewell or tanker.

बिजली

We have not verified power-supply details. Ask for recent electricity bills, the sanctioned load and the meter type, and check for frequent outages.

Approvals and registration

Check the project and the agent on the Delhi RERA portal (rera.delhi.gov.in). The registration number should appear on brochures and ads. Delhi RERA's registered list is short, partly because many projects fall below its size threshold. A project missing from it therefore needs more questions, not automatic rejection. Compare what is built with the sanctioned plan, since extra floors and coverage are a recurring Delhi problem. Ask for a search of registered charges and mortgages as well. For older cooperative or DDA-linked societies, also confirm land title and the society's transfer procedure.

मुकदमे और अटके प्रोजेक्ट

We found no verified, area-level list of stalled projects or disputes for this update. Run a court-records search on the seller and the society before paying any advance, and ask a property lawyer to review the title chain.

निर्माणाधीन या प्रस्तावित बुनियादी ढांचा

  • Delhi Metro Phase 4: several sections are still under construction, with dates that may shift (see above).
  • Master Plan 2041: still awaiting notification as of April 2026. Land-use and redevelopment rules could change once it is notified.
  • UER-II: the main stretch is open. Reports indicate further phases and extensions are still at planning or construction stage.

किसके लिए उपयुक्त है

खरीदने से पहले क्या जांचें

  • RERA registration, sanctioned plans and the title chain.
  • The society's maintenance dues, parking rights and any pending repair or redevelopment decisions.
  • Water and power reliability, ideally by speaking to current residents.
  • Metro status on the DMRC website, not on a broker's promise.
  • Whether the unit is freehold, leasehold or DDA/cooperative-society property, and what transfer charges apply.
स्रोत

18 Oct 2026 को अपडेट किया गया। सामान्य जानकारी; निर्णय लेने से पहले प्राधिकरण और बिल्डर से विवरण जांच लें।

Questions about New Delhi

What is the property price per sq ft in New Delhi?

Asking prices on ADiHomes range from ₹4,800 to ₹30,250 per sq ft, with a median of ₹16,190, based on 123 properties listed as of 18 Oct 2026.

How many residential projects are in New Delhi?

293 projects are listed on ADiHomes, by builders including Cooperative Group Housing Society, Delhi Development Authority, Housing Society Ltd., Unity Group, A R Buildtech.

Does ADiHomes have live projects in New Delhi?

On ADiHomes as of October 2026, there are 0 live projects in New Delhi. Listing pages exist for societies such as Sahyog Apartments and The Ekta Apartment.

Is the Delhi Master Plan 2041 in force?

Not as far as we could verify. One property-data source says MPD-2041 was still unnotified as of April 2026, so the 2007 MPD-2021 remains the operative law.

How do I check if a Delhi project is RERA registered?

Search the Delhi RERA portal at rera.delhi.gov.in by project name, promoter, district or registration number. Delhi's registered list is short because smaller projects fall below the size threshold, so ask the seller why a project is not listed.

Is water supply a problem in Delhi?

Supply is under strain. A CAG audit tabled in March 2026 reported growing shortfalls in raw and potable water, and the government uses tankers in shortage areas. Ask residents about supply hours and quality for the specific address.

क्या Jewar हवाई अड्डा खुल गया है?

Yes. Noida International Airport at Jewar began commercial operations on 15 June 2026. A travel site puts it about 70 km from central Delhi, so IGI Airport is the main airport for most of the city.

Are all the new Delhi Metro lines open?

No. Some Phase 4 sections have opened, such as Deepali Chowk–Majlis Park on 8 March 2026. Others, including parts of the Golden and Magenta lines, are still expected later, and sources give different dates.