Ask anyone house-hunting in Noida what matters most, and “metro nearby” comes up fast. But the Noida metro is a small network. Two different operators run it, and the planned extensions are at very different stages. This guide separates what runs today from what is only approved or proposed. It also covers the last stretch from station to front door, which often decides whether a commute is comfortable. Status is as of 20 October 2026. Plans in this area change often, so treat dates as targets.
The Noida metro today: two systems
Noida is served by two separate metro systems. The Aqua Line is run by Noida Metro Rail Corporation (NMRC). The Blue Line belongs to the Delhi Metro (DMRC). They are not one network, which is why the interchange between them matters so much.
| Line | Operator | What it covers | Key facts |
|---|---|---|---|
| Aqua Line | NMRC | Noida Sector 51 to Depot Station, Greater Noida | 21 stations, operational since 25 January 2019. The 29.7 km route is fully elevated. |
| Blue Line | DMRC | Dwarka Sector 21 to Noida Electronic City | Botanical Garden is a Blue Line and Magenta Line station in Noida. Sector 52 is the station closest to the Aqua Line. |
Aqua Line: timings and frequency
The Aqua Line runs four-coach trains. Frequency figures differ between sources, so check before you plan a daily commute. NMRC’s own timetable page gives roughly 7 minutes 30 seconds at peak and 10 minutes off-peak, Monday to Friday. Some third-party sites still list 10 to 15 minutes. NMRC’s page is the better reference, but timetables change.
Services run from about 6:00 am to 10:45 pm Monday to Saturday, and from 8:00 am on Sundays. First and last train times differ station by station, so check your own station.
Stations along the Expressway include Sectors 137, 142, 143, 144, 145, 146, 147 and 148. Further south are Knowledge Park II, Pari Chowk, Alpha 1, Delta 1, GNIDA Office and Depot Station. Homes within easy reach of these stations have a direct rail link along the Noida-Greater Noida Expressway.
Ridership is rising
NMRC data shows average daily ridership of 60,705 in June, 61,811 in July and 73,298 in August 2026. Average daily numbers then reached about 85,000 in September. Officials link the September jump to the new skywalk (see below). Treat the September number as early, since it came from a month still in progress.
Blue Line: older sectors and job areas
The Blue Line serves Noida’s older sectors and the Electronic City end of the city. Sector 52, one of its newer stations, opened in March 2019. We found no newer Blue Line extension within Noida, so check DMRC’s website for any change. If you are looking at Ghaziabad areas such as Indirapuram, work out which station and which exit is actually practical for you. We could not verify gate-level details for this update.
Changing between the two lines: the Sector 51/52 skywalk
For years, switching meant leaving the Aqua Line’s Sector 51 station and walking along the road to the Blue Line’s Sector 52 station. That has changed. An air-conditioned skywalk now links the two stations, with travelators and lifts. It opened to the public on 28 August 2026.
One report puts the transfer at around 6 to 7 minutes, against 12 to 15 minutes earlier. The walk alone is shorter, but the two systems are still separate. In earlier years riders had to exit one system and enter the other, with separate tickets and security checks. We could not confirm the current fare or card rules for transfers, so check at the station before you assume a single ticket works.
This link is the main reason Sector 51/52 matters so much. It is the practical gateway for anyone living on the Aqua Line who works in Delhi or central Noida.
Planned extensions: approved, pending and unclear
| Project | Length / stations | Stage as of 20 Oct 2026 |
|---|---|---|
| Botanical Garden to Sector 142 | 11.56 km, 8 elevated stations | Union Cabinet approved in February 2026. A civil contract has been awarded. No confirmed opening date. |
| Depot Station to Boraki hub | About 2.6 km to the Multi-Modal Transport Hub | Covered by the same civil contract as above. Check NMRC for its status. |
| Greater Noida West (Sector 61/51 to Sector 4, Gaur Chowk) | 8.4 km, 5 stations | Public Investment Board cleared it in July 2026. Union Cabinet approval was still awaited in the latest reports we found. |
Botanical Garden to Sector 142: the most solid project
The Centre cleared an 11.56 km extension with eight elevated stations, at an estimated Rs 2,254 crore, with completion expected within four years. The stations are Botanical Garden, Sector 44, Sector 96 (Noida Authority Office), Sector 97, Sector 105, Sector 108, Sector 93 and Panchsheel Balak Inter College (Sector 91). Botanical Garden would give direct interchange with the Blue Line and the Magenta Line.
The project has moved past approval. NMRC awarded Larsen & Toubro a Rs 1,234 crore order for elevated viaducts and 10 metro stations under the Aqua Line extension project. The contract covers both the Botanical Garden to Sector 142 corridor and the Depot Station to Boraki corridor. The completion period is three years (1,096 days). That is a contract term. It does not tell you when trains will carry passengers, so we would not plan around an opening date.
If you are looking at Expressway-side homes, our Noida Expressway guide and the Sector 105 guide cover the area. Sector 105 is one of the planned station locations.
Greater Noida West: progress, but not yet approved at the top
This is the extension many Greater Noida West buyers are watching, and the plan has shrunk. The Uttar Pradesh Cabinet had approved a report for a line from Sector 51 to Knowledge Park V, costing Rs 2,991.60 crore. That original corridor was about 17 km with 11 stations. It was later cut back.
The current version is shorter. The Public Investment Board approved the 8.4 km corridor on 22 July, and the proposal was due to go to the Union Cabinet. It is pegged at nearly Rs 2,000 crore, with stations planned at Sectors 61, 70, 122, 123 and Greater Noida West Sector 4 (Gaur Chowk). The Noida CEO said the project report had reached the Prime Minister’s Office and all required no-objection certificates were in. Construction is expected to take around four years after work begins.
One caution: sources differ on whether the line starts at Sector 51 or Sector 61. Sector 61 is the Blue Line interchange in some reports. Also, we could not find confirmation that the Union Cabinet has cleared it. Until it does, tendering cannot start. Even after approval, add the construction time.
So today, the nearest working metro for Greater Noida West residents is still in the Sector 51/52 area. Buyers need road or bus links to reach it. Our Greater Noida West guide covers the area in more detail.
Last-mile options: the part brokers skip
A station on the map does not mean an easy daily trip. The walk, ride or wait between the station and your door often decides the commute.
- Walking and e-rickshaws. These are the default at most stations. We could not find a current official e-rickshaw fare chart, and older launch-era fares are out of date. Ask residents of the society what they pay.
- Electric buses. Noida Authority and UPSRTC planned 50 electric buses on four routes from Botanical Garden. The planned destinations were Greater Noida West, Sector 62, Surajpur Collectorate and Noida International Airport. One portal reports the service as launched, with starts at Botanical Garden or the Sector 90 depot. It also advises confirming boarding points and the current schedule before travelling. We could not verify frequency or fares, so check the timetable first.
- Feeder buses. NMRC has run feeder routes before. A 2019 timetable listed one between Greater Noida West’s ACE City and the Sector 51 metro station. That timetable is old, so confirm it still runs.
- Own vehicle. Check parking at the station. A cheap ride loses its appeal if you cannot park the car or bike.
What a commute actually costs
Aqua Line fares rise with the number of stations travelled. NMRC lists Rs 10 for one station, Rs 15 for two and Rs 20 for three to six stations on Monday to Saturday. A third-party chart lists Rs 30 for 7 to 9 stations, Rs 40 for 10 to 16 and Rs 50 for 17 to 20. The maximum on Sundays and national holidays is Rs 40. Confirm current fares with NMRC.
| Stations travelled (Mon-Sat) | Fare per trip |
|---|---|
| 1 | Rs 10 |
| 2 | Rs 15 |
| 3 to 6 | Rs 20 |
| 7 to 9 | Rs 30 |
| 10 to 16 | Rs 40 |
| 17 to 20 | Rs 50 |
Worked example 1: monthly cost, Depot to Sector 51
Say you ride the full line (20 stations) on 22 working days a month. That is 44 trips at Rs 50, or Rs 2,200. The NMRC smart card is reported to give a 10% discount, which would bring this to about Rs 1,980. Now add the last mile. If you assume Rs 20 each way by e-rickshaw (an assumption, not a published fare), that is another Rs 880. The metro fare alone understates the real cost, and the Blue Line leg to Delhi comes on top.
Worked example 2: a rough time budget
A full run of the line takes about 45 minutes. Take a resident near the far end who works near Sector 52. Assume 10 minutes from home to the station, about 4 minutes of waiting at peak (half of a 7.5-minute gap), 45 minutes on the train, and about 7 minutes through the skywalk. That is roughly 66 minutes before any Blue Line ride. These are illustrations, not measured times. Test your own route.
How connectivity should shape your home choice
- Separate “open” from “approved” from “proposed”. A running station is a fact. An approved corridor is likely but slow. A proposed one can change route, shrink or stall, as the Greater Noida West plan did.
- Test the last mile yourself. Visit at peak hour. Walk or ride from the society gate to the station and time the full trip.
- Count the transfers. A Delhi-bound commute from the Aqua Line still involves a change at Sector 51/52. The Botanical Garden link is meant to reduce that, but it is under construction, not open.
- Do not pay extra for a line that does not exist yet. Metro news can lift talk about prices, but it guarantees nothing about values or rents. Price a home as if the station may arrive late, or not as planned.
- Look at the whole picture. Roads, schools, hospitals and your workplace matter as much as a station. Verify registration and approvals as usual.
If you want a rail-linked home now, look along the existing Aqua Line stations or near Blue Line stations. If you can rely on roads and buses for several years, Greater Noida West may still suit you.
Before you decide
Check NMRC’s and DMRC’s official pages for station lists, timings and project status. Then use ADiHomes property search to compare homes against your actual commute. Visit on a weekday, take the trip yourself, and decide based on what runs today.
Frequently asked questions
How many metro lines serve Noida?
Two separate systems serve it. NMRC runs the Aqua Line, which has 21 stations from Noida Sector 51 to Depot Station in Greater Noida. The Delhi Metro's Blue Line serves older Noida sectors and ends at Electronic City.
How do I change between the Aqua Line and the Blue Line?
Use the air-conditioned skywalk between the Aqua Line's Sector 51 station and the Blue Line's Sector 52 station. It opened on 28 August 2026, and one report puts the walk at about 6 to 7 minutes. The two systems are still separate, so check ticketing rules at the station.
How often do Aqua Line trains run and what are the timings?
NMRC's timetable page gives roughly 7.5 minutes at peak and 10 minutes off-peak on weekdays. Services run from about 6:00 am to 10:45 pm Monday to Saturday, and from 8:00 am on Sundays. Check NMRC for current timings.
How much does an Aqua Line ticket cost?
Fares start at Rs 10 for one station and Rs 15 for two stations, and rise with distance. A third-party chart lists Rs 50 for 17 to 20 stations, and Sunday and holiday fares are lower. Confirm the latest chart with NMRC.
When will the Botanical Garden to Sector 142 extension open?
No opening date has been confirmed. The Union Cabinet approved the 11.56 km, eight-station line in February 2026, with a four-year timeline, and a civil contract with a three-year term has been awarded. Treat any date as a target.
Will Greater Noida West get a metro?
A shorter 8.4 km, five-station corridor ending at Sector 4 (Gaur Chowk) has cleared the Public Investment Board. We found no confirmation of Union Cabinet approval, and construction is expected to take about four years after work starts.
Does a Delhi Metro card work on the Aqua Line?
Older guides say the Aqua Line needed its own NMRC card. Integrated ticketing has been discussed, but we could not verify the current rule. Check at the station or on the NMRC website.
Sources
- Train Timings – First & Last Metro – NMRC
- Noida Metro Ridership Rises 20 Per Cent After Sector 51-52 Skywalk – Construction World
- Noida Skywalk Raises Aqua Line Ridership by 20 Per Cent – Construction World
- Noida Metro Ridership Surges 20% Following Sector 51-52 Skywalk Opening – Metro Rail News
- First AC skywalk opens, Sector 51-52 metro journey now just 6-7 minutes – Apartment Times
- Aqua Line (Noida Metro) – Wikipedia
- Noida Metro – Wikipedia
- Noida Sector 52 metro station – Wikipedia
- Botanical Garden metro station – Wikipedia
- Centre approves 11.56 Km metro extension from Noida Sector 142 to Botanical Garden – India TV
- Cabinet Approves Noida Metro Extension From Sector 142 To Botanical Garden – Construction World
- Cabinet approval for Sector 142 to Botanical Garden – All India Radio News
- L&T to Execute Rs 1,234 Crore Civil Package for Noida Metro's Aqua Line – News on Projects
- Noida Metro: L&T bags order worth Rs 1,234 crore for Aqua Line – BigInfo
- Greater Noida West Metro Project May Get Cabinet Nod This Month – Metro Rail News
Updated 20 October 2026. This article is general information, not legal or financial advice; check current rules and project details before you decide.