मुख्य सामग्री पर जाएँ

Dwarka Expressway, Gurugram: प्रॉपर्टी की कीमतें, प्रोजेक्ट और घर

Dwarka Expressway, Gurugram has 131 projects listed on ADiHomes. Asking prices range from ₹2,941 to ₹35,100 per sq ft, with a median of ₹11,208 (based on 114 properties, Oct 2026).

एक नज़र में

प्रोजेक्ट
131
बिक्री के लिए
0
किराए पर
0
प्रति sq ft कीमत (मध्यिका)
₹11,208 from 114 properties
2 BHK किराया (मध्यिका)
अभी पर्याप्त लिस्टिंग नहीं हैं
रहने के लिए तैयार प्रोजेक्ट
92
निर्माणाधीन प्रोजेक्ट
35
नए लॉन्च हुए प्रोजेक्ट
4

ADiHomes की सक्रिय लिस्टिंग से गणना की गई, 18 Oct 2026। मांगी गई कीमतें हैं, पंजीकृत बिक्री की कीमतें नहीं।

Projects in Dwarka Expressway

See all

Loading map…

यहाँ प्रोजेक्ट वाले बिल्डर

Dwarka Expressway locality guide

Dwarka Expressway, Gurugram: a buyer's locality guide

This guide covers the Gurugram side of the Dwarka Expressway. Facts below come from public sources. Where something is unconfirmed or still changing, the text says so.

यह कहाँ है और इसकी बसावट कैसी है

The Dwarka Expressway (NH-248BB) runs roughly 27.6 to 29 km from Shiv Murti near Mahipalpur in Delhi to the Kherki Daula toll plaza on NH-48. The Haryana section is about 19 km.

In Gurugram the elevated main carriageway passes Sectors 102 to 106 and 109 to 113, with a service-road carriageway running beneath it. Sobha City sits in Sector 108, just off the expressway. Many projects cluster in Sector 102, which also sits along Basai Road.

Sector numbers are used loosely in marketing. Check a plot's actual sector on the RERA record, not just the brochure.

कनेक्टिविटी

Roads. The Haryana stretch was inaugurated in March 2024. The Delhi portion of about 10.1 km was inaugurated on 17 August 2025. Wikipedia gives June 2025 for the full route, so sources differ on the exact date. The route ends at NH-48 near Kherki Daula.

Metro. No metro station runs along the Gurugram sectors today. The nearest operating station on the Delhi side is Dwarka Sector 21, on the Blue Line and Airport Express. I could not verify road distances from each sector to it.

Rail. One portal lists Basai Dhankot railway station about 3.7 km from Sector 102 and Gurgaon station about 6.3 km. Treat these as estimates.

Airport. The expressway links to Delhi's IGI Airport through a tunnel on the Delhi side. I found no reliable distance or drive time from the Gurugram sectors, so test the drive yourself at peak hours. One report described delays of up to 20 minutes inside the tunnel at a key junction.

स्कूल, अस्पताल और खरीदारी

The figures below are portal estimates, not measured distances.

  • स्कूल: Gurugram Global Heights School is in Sector 102. DPS, SN International and Golden Valley are listed 4 to 6 km away.
  • अस्पताल: Shri Multispeciality Hospital (about 4 km), ESIC Hospital (about 4.5 km), and Medanta at roughly 12 km. Columbia Asia and Medeor are also named by one portal.
  • खरीदारी: Ocus Medley and Hartron Tower are listed about 1 km from Sector 102. Conscient One Mall is also named among malls in the area.

Daily-needs retail is still thin in some sectors. Visit on a weekday evening before you decide.

जांचने लायक नागरिक सुविधाएं

Water. This is the issue to ask residents about. A Tribune report said people in around 200 societies along the expressway were pressured to pay or buy tankers at high prices. That report is older. A June 2026 Newslaundry piece found scarcity and private tankers routine at the end of Gurugram's water network, though it covered older sectors rather than this corridor. Ask the RWA about piped GMDA supply, tanker spend and groundwater use.

Power. A 2026 report said several communities along the corridor had repeated multi-hour outages. Residents' associations blamed delays in connecting high-capacity electricity infrastructure. Ask what backup the society provides and what it costs per month.

Drainage. Sectors 112 to 115 have faced waterlogging. A 7.59 km drainage system was approved, with completion targeted around May 2026. I could not confirm that it has been finished.

Tolls. Residents have asked for the Kherki Daula toll plaza to be removed. The state has promised removal over the years without result. No change is confirmed.

Approvals and disputes. I found no verified, current report of a corridor-wide stalled-project or litigation problem. That does not mean there are none. The expressway itself was delayed by land acquisition and clearance issues. For any project, check its Haryana RERA registration, approved plans, the occupation certificate for completed towers, and any court cases against the developer or land.

निर्माणाधीन या प्रस्तावित बुनियादी ढांचा

  • Service roads: GMDA said on 5 June 2026 that 70 per cent was complete, with completion expected by September. Some locations still needed land acquisition. I could not confirm whether they have fully opened.
  • Gurugram Metro: A 28.5 km corridor from Millennium City Centre to Cyber City, costing Rs 5,452.72 crore, had its Bhoomi Pujan on 5 September. It includes a 1.85 km spur from Basai Village to Sector 101. One 2026 guide describes Phase 1 as under construction and Phase 2 in tendering. An earlier report gave a four-year completion target.
  • Link to Dwarka Sector 21: The project head listed Rejangla Chowk to Dwarka Sector 21 as a planned future extension. Some property blogs call a 2026-27 opening confirmed. I found no official source for that, so treat the date as unconfirmed.
  • Expressway extension: A DIAL master plan from May 2026 proposes extending the expressway to Mayapuri Ring Road. It is a proposal only, with approvals and timelines still open.
  • Basai to IFFCO Chowk road: GMDA has a Rs 52 crore plan to renovate a nine-kilometre stretch, awaiting final endorsement as of May 2026.

किसके लिए उपयुक्त है और क्या जांचें

The corridor suits buyers who want Delhi and the airport reachable by road and who are comfortable with a still-developing area. It is a poorer fit if you need a metro on your doorstep today or fully settled utilities.

On ADiHomes as of October 2026, there are 4 live projects here, all ready to move, with a median asking price of ₹15,000 per sq ft from 3 properties. They include Sobha City और Conscient Heritage Max, plus Experion Windchants and Shapoorji Pallonji Joyville Gurugram. Confirm the exact location of each before visiting. You can also browse flats for sale in Dwarka Expressway या new projects in Dwarka Expressway.

खरीदने से पहले:

  • Verify the RERA number and the occupation certificate on the official Haryana RERA portal.
  • Ask the RWA about water, power cuts, maintenance charges and tanker costs.
  • Check how you would reach work and school at peak hours, including the toll.
  • Do not pay extra for metro plans that have no confirmed date.
  • Ask for the sale deed, the loan-approval status and any pending dues.
स्रोत

18 Oct 2026 को अपडेट किया गया। सामान्य जानकारी; निर्णय लेने से पहले प्राधिकरण और बिल्डर से विवरण जांच लें।

Questions about Dwarka Expressway

What is the property price per sq ft in Dwarka Expressway, Gurugram?

Asking prices on ADiHomes range from ₹2,941 to ₹35,100 per sq ft, with a median of ₹11,208, based on 114 properties listed as of 18 Oct 2026.

How many residential projects are in Dwarka Expressway, Gurugram?

131 projects are listed on ADiHomes, by builders including ATS Infrastructure, BPTP, Ramprastha Group, Sobha Limited, Imperia Structures.

How long is the Dwarka Expressway and where does it run?

It is about 27.6 to 29 km long, depending on the source. It runs from Shiv Murti near Mahipalpur in Delhi to the Kherki Daula toll plaza on NH-48, with about 19 km in Haryana.

Which Gurugram sectors does the Dwarka Expressway pass through?

The Gurugram stretch passes Sectors 102 to 106 and 109 to 113, according to Wikipedia. Projects in nearby sectors such as 99 and 108 are also marketed as being on the expressway.

Is there a metro station on the Dwarka Expressway in Gurugram?

Not yet. The nearest operating station is Dwarka Sector 21 on the Delhi side. A Gurugram Metro corridor with a spur from Basai Village toward Sector 101 is under development, and a link to Dwarka Sector 21 is only planned, with no confirmed date.

Are the service roads along the expressway finished?

GMDA said on 5 June 2026 that the work was 70 per cent complete, with completion targeted for September 2026. I could not confirm that they have fully opened, so check on site.

What water and power problems should buyers ask about?

Reports describe tanker dependence for water in some societies along the corridor. They also describe multi-hour power outages in 2026. Ask the RWA for current supply hours, backup arrangements and monthly costs.

What do ADiHomes listings show for Dwarka Expressway?

On ADiHomes as of October 2026, there are 4 live projects, all ready to move. The median asking price is ₹15,000 per sq ft from 3 properties.